PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed hangers for the electrical conduits at the 2nd Floor Facing West (800x600).jpg Installed overhead conduita at the 1st floor Facing East (800x600).jpg Installed vent piping at the Sprinkler Room Facing East (800x600).jpg Started installing 2 gas piping at the 1st floor Facing East  (800x600).jpg Started installing top metal track for the interior framing at the 2nd floor Facing South (800x600).jpg
Previous page Started installing top metal track for the interior framing at the 2nd floor Facing South (800x600)
Started installing top metal track for the interior framing at the 2nd floor Facing South (800x600)